title: "Power generation & distribution"
date: 2026-03-19T11:44:00+01:00
author: Vincent Weijermars
canonical_url: "https://www.bredenoord.com/en/innovations/power-generation-distribution/"
section: Innovation
---
![Bredenoord Innovatie Power Generation en Distribution](https://d214mxx6i7ojph.cloudfront.net/eyJidWNrZXQiOiJicmVkZW5vb3JkLXByb2QtYnVja2V0Iiwia2V5IjoiaW1hZ2VzL2hlcm8vQnJlZGVub29yZC1Jbm5vdmF0aWUtUG93ZXItR2VuZXJhdGlvbi1lbi1EaXN0cmlidXRpb24uanBnIiwiZWRpdHMiOnsianBlZyI6eyJxdWFsaXR5Ijo4MiwicHJvZ3Jlc3NpdmUiOnRydWUsInRyZWxsaXNRdWFudGlzYXRpb24iOnRydWUsIm92ZXJzaG9vdERlcmluZ2luZyI6dHJ1ZSwib3B0aW1pemVTY2FucyI6dHJ1ZX0sInJlc2l6ZSI6eyJ3aWR0aCI6NDIwLCJoZWlnaHQiOjE3NiwiZml0IjoiY292ZXIifX19)

At Bredenoord, we are actively committed to expanding and modernising our rental fleet. We continuously invest in transformers, distribution boxes, circuit breakers and cables, enabling us to distribute the energy generated on-site efficiently and safely to end users. This expansion allows us to respond even more effectively to the growing demand for flexible and reliable energy solutions.

## Innovation in fuel consumption and emission reduction

A key focus within our Power Generation &amp; Distribution innovation pillar is making our energy generation more sustainable. For example, we are increasingly replacing fossil fuels in our generators with cleaner alternatives such as GTL (Gas-to-Liquid) and HVO100 (Hydrotreated Vegetable Oil). These fuels ensure a significant reduction in harmful emissions and contribute to a cleaner living environment.

In addition, we are developing an increasing number of Stage V Power generators with low emissions. These advanced machines are designed to drastically reduce emissions of CO₂, nitrogen oxides (NOₓ) and particulate matter. Our Denox systems also play a key role in this: they offer an effective solution for reducing NOₓ emissions, which is particularly important in environmentally sensitive areas or where regulations are stricter.

Thanks to these technological innovations, we can not only generate cleaner energy but also ensure a reliable, safe and efficient distribution of electricity. In this way, we contribute to a more sustainable future, without compromising on the quality and continuity of our services.

Want to know more about Innovation at Bredenoord?

![Edwin de Graaf Bredenoord](https://d214mxx6i7ojph.cloudfront.net/eyJidWNrZXQiOiJicmVkZW5vb3JkLXByb2QtYnVja2V0Iiwia2V5IjoiaW1hZ2VzL2F2YXRhci9FZHdpbi1kZS1HcmFhZi1CcmVkZW5vb3JkLnBuZyIsImVkaXRzIjp7InBuZyI6eyJxdWFsaXR5Ijo4MiwicHJvZ3Jlc3NpdmUiOnRydWV9LCJyZXNpemUiOnsid2lkdGgiOjEyMCwiaGVpZ2h0IjoxNjAsImZpdCI6ImNvdmVyIn19fQ==)

Edwin de GraafProduct Manager Operational Equipment

![Edwin de Graaf Bredenoord](https://d214mxx6i7ojph.cloudfront.net/eyJidWNrZXQiOiJicmVkZW5vb3JkLXByb2QtYnVja2V0Iiwia2V5IjoiaW1hZ2VzL2F2YXRhci9FZHdpbi1kZS1HcmFhZi1CcmVkZW5vb3JkLnBuZyIsImVkaXRzIjp7InBuZyI6eyJxdWFsaXR5Ijo4MiwicHJvZ3Jlc3NpdmUiOnRydWV9LCJyZXNpemUiOnsid2lkdGgiOjQwMCwiaGVpZ2h0IjozNzksImZpdCI6ImNvdmVyIn19fQ==)

**Edwin de Graaf**Product Manager Operational Equipment

## Insights

[ More insights ](https://www.bredenoord.com/en/insights/)

[![A close-up of a cutaway gearbox showing gears and other mechanical components.](https://d214mxx6i7ojph.cloudfront.net/eyJidWNrZXQiOiJicmVkZW5vb3JkLXByb2QtYnVja2V0Iiwia2V5IjoiaW1hZ2VzL2hlcm8vb2xkX3NpdGUvSW5zaWRlLW9mLWEtZ2VhcmJveC5qcGciLCJlZGl0cyI6eyJqcGVnIjp7InF1YWxpdHkiOjgyLCJwcm9ncmVzc2l2ZSI6dHJ1ZSwidHJlbGxpc1F1YW50aXNhdGlvbiI6dHJ1ZSwib3ZlcnNob290RGVyaW5naW5nIjp0cnVlLCJvcHRpbWl6ZVNjYW5zIjp0cnVlfSwicmVzaXplIjp7IndpZHRoIjozNzUsImhlaWdodCI6Mzc1LCJmaXQiOiJjb3ZlciJ9fX0=)

Stage V for NRMM: a big step towards cleaner energy

As of January 2020 all newly built gensets must comply to the requirements of Stage V for NRMM (non road mobile machinery). This means the current fleet of gensets may still be used, but all newly built gensets must comply to the Stage V standard. This article will cover the contents of Stage V and the latest developments concerning gensets.](https://www.bredenoord.com/en/insights/stage-v-for-nrmm/ "Stage V for NRMM: a big step towards cleaner energy")[![Bredenoord Ecofactorij 170](https://d214mxx6i7ojph.cloudfront.net/eyJidWNrZXQiOiJicmVkZW5vb3JkLXByb2QtYnVja2V0Iiwia2V5IjoiaW1hZ2VzL2hlcm8vb2xkX3NpdGUvQnJlZGVub29yZC1FY29mYWN0b3Jpai0xNzAuanBnIiwiZWRpdHMiOnsianBlZyI6eyJxdWFsaXR5Ijo4MiwicHJvZ3Jlc3NpdmUiOnRydWUsInRyZWxsaXNRdWFudGlzYXRpb24iOnRydWUsIm92ZXJzaG9vdERlcmluZ2luZyI6dHJ1ZSwib3B0aW1pemVTY2FucyI6dHJ1ZX0sInJlc2l6ZSI6eyJ3aWR0aCI6Mzc1LCJoZWlnaHQiOjM3NSwiZml0IjoiY292ZXIifX19)

This is how a synchronous grid takeover works

During a synchronous grid takeover one energy source takes over from another, without the final consumer noticing anything. This method requires more preparation than a regular grid takeover. This article elaborates on the situations in which a synchronous grid takeover would be preferable, how this works and which energy solutions you can use.](https://www.bredenoord.com/en/insights/this-is-how-a-synchronous-grid-takeover-works/ "This is how a synchronous grid takeover works")[![Powermanagement Installation 1](https://d214mxx6i7ojph.cloudfront.net/eyJidWNrZXQiOiJicmVkZW5vb3JkLXByb2QtYnVja2V0Iiwia2V5IjoiaW1hZ2VzL2hlcm8vb2xkX3NpdGUvQ2FzZS1IZWFkZXItUG93ZXJtYW5hZ2VtZW50LmpwZyIsImVkaXRzIjp7ImpwZWciOnsicXVhbGl0eSI6ODIsInByb2dyZXNzaXZlIjp0cnVlLCJ0cmVsbGlzUXVhbnRpc2F0aW9uIjp0cnVlLCJvdmVyc2hvb3REZXJpbmdpbmciOnRydWUsIm9wdGltaXplU2NhbnMiOnRydWV9LCJyZXNpemUiOnsid2lkdGgiOjM3NSwiaGVpZ2h0IjozNzUsImZpdCI6ImNvdmVyIn19fQ==)

Power management

Bredenoord’s power management is the solution for all types of users who experience a slow or phased difference in the demand for power. With power management, you have a reliable power supply where one or more generators can be switched on or off automatically in direct response to the demand for power at that moment, maximising efficiency and reducing fuel consumption. Bredenoord’s power management is suitable for events, building sites, production plants, public utilities and more.](https://www.bredenoord.com/en/insights/power-management/ "Power management")

[ More insights ](https://www.bredenoord.com/en/insights/)

## Cases

[ More cases ](https://www.bredenoord.com/en/cases/)

[![Stage V genset emergency shelter Elst](https://d214mxx6i7ojph.cloudfront.net/eyJidWNrZXQiOiJicmVkZW5vb3JkLXByb2QtYnVja2V0Iiwia2V5IjoiaW1hZ2VzL2hlcm8vb2xkX3NpdGUvU3RhZ2UtVi1nZW5zZXQtZW1lcmdlbmN5LXNoZWx0ZXItRWxzdC5qcGciLCJlZGl0cyI6eyJqcGVnIjp7InF1YWxpdHkiOjgyLCJwcm9ncmVzc2l2ZSI6dHJ1ZSwidHJlbGxpc1F1YW50aXNhdGlvbiI6dHJ1ZSwib3ZlcnNob290RGVyaW5naW5nIjp0cnVlLCJvcHRpbWl6ZVNjYW5zIjp0cnVlfSwicmVzaXplIjp7IndpZHRoIjozNzUsImhlaWdodCI6Mzc1LCJmaXQiOiJjb3ZlciJ9fX0=)

Stage V gensets power emergency shelter in Elst

The locations of emergency shelter organization Crisis Noodopvang (CNO) are intended as an overflow for the shelter in Ter Apel, the Netherlands. At the moment all refugee shelters in the Netherlands and the asylum application center in Ter Apel are overcrowded. Because of this the Dutch government has asked all municipalities to provide extra shelter for refugees. One of the municipalities that complied with this request is Overbetuwe. The city of Elst falls under this municipality, and they set up a location that can accommodate 120 asylum seekers on business park De Aam.

 10-01-2023 ](https://www.bredenoord.com/en/cases/stage-v-gensets-power-emergency-shelter-in-elst/ "Stage V gensets power emergency shelter in Elst")[![Energy for energy project: Bredenoord guarantees that water pumps will continue to operate 24/7](https://d214mxx6i7ojph.cloudfront.net/eyJidWNrZXQiOiJicmVkZW5vb3JkLXByb2QtYnVja2V0Iiwia2V5IjoiaW1hZ2VzL2hlcm8vb2xkX3NpdGUvQ2FzZS1IZWFkZXItTW9iaWxlLUVuZXJneS1CYWx0aWMtUGlwZS5qcGciLCJlZGl0cyI6eyJqcGVnIjp7InF1YWxpdHkiOjgyLCJwcm9ncmVzc2l2ZSI6dHJ1ZSwidHJlbGxpc1F1YW50aXNhdGlvbiI6dHJ1ZSwib3ZlcnNob290RGVyaW5naW5nIjp0cnVlLCJvcHRpbWl6ZVNjYW5zIjp0cnVlfSwicmVzaXplIjp7IndpZHRoIjozNzUsImhlaWdodCI6Mzc1LCJmaXQiOiJjb3ZlciJ9fX0=)

Energy for an energy project: Bredenoord ensures water pumps will operate 24/7

Dewatering specialist Hölscher has been awarded a contract to drain the pipe trenches under excavation on the Jutland peninsula and the island of Funen as part of the Baltic Pipe Project. The challenge: at times the groundwater level is higher than the lowest point of the planned excavations. Also, the section under construction is approximately 140 kilometres long and is highly vulnerable to flooding, owing to its proximity to the sea. To keep the pipe trench dry, Hölscher is relying on the continuous operation of its water pumps. Bredenoord has undertaken the task of providing an uninterruptible power supply to the pumps. This way it is possible to lay the gas pipelines without any problems, despite of the challenging conditions.

 09-06-2021 ](https://www.bredenoord.com/en/cases/energy-for-energy-project-bredenoord-ensures-water-pumps-will-operate/ "Energy for an energy project: Bredenoord ensures water pumps will operate 24/7")[![Bredenoord energy for transport and logistics](https://d214mxx6i7ojph.cloudfront.net/eyJidWNrZXQiOiJicmVkZW5vb3JkLXByb2QtYnVja2V0Iiwia2V5IjoiaW1hZ2VzL2hlcm8vb2xkX3NpdGUvQnJlZGVub29yZC1lbmVyZ3ktZm9yLXRyYW5zcG9ydC1hbmQtbG9naXN0aWNzLmpwZyIsImVkaXRzIjp7ImpwZWciOnsicXVhbGl0eSI6ODIsInByb2dyZXNzaXZlIjp0cnVlLCJ0cmVsbGlzUXVhbnRpc2F0aW9uIjp0cnVlLCJvdmVyc2hvb3REZXJpbmdpbmciOnRydWUsIm9wdGltaXplU2NhbnMiOnRydWV9LCJyZXNpemUiOnsid2lkdGgiOjM3NSwiaGVpZ2h0IjozNzUsImZpdCI6ImNvdmVyIn19fQ==)

Economical and clean power solution for huge peak demand in the city centre of Utrecht

Light rail 60 is an important part of the infrastructure in Utrecht. This tram, which runs on electricity supplied by high-voltage cables, transports thousands of passengers every day between Utrecht Centraal and Nieuwegein. Last summer, however, problems arose here, when a number of high-voltage cables were damaged during excavation work. The recovery was expected to take several weeks, with the tram unable to be powered. Of course, it is not desirable to shut down such an important tram line, so an alternative power solution had to be sought. The City asked the help of Engie Bredenoord for this.

 21-04-2021 ](https://www.bredenoord.com/en/cases/economical-and-clean-power-solution/ "Economical and clean power solution for huge peak demand in the city centre of Utrecht")

[ More cases ](https://www.bredenoord.com/en/cases/)

## See our 100 kVA Stage V Power generator

[ View all generators ](https://www.bredenoord.com/en/rental/generators/)

[![100 kVA Stage V Power generator](https://d214mxx6i7ojph.cloudfront.net/eyJidWNrZXQiOiJicmVkZW5vb3JkLXByb2QtYnVja2V0Iiwia2V5IjoiaW1hZ2VzL3Byb2R1Y3QvQnJlZGVub29yZC0xMDAta1ZBLVN0YWdlLVYtUG93ZXItZ2VuZXJhdG9yLmpwZyIsImVkaXRzIjp7ImpwZWciOnsicXVhbGl0eSI6ODIsInByb2dyZXNzaXZlIjp0cnVlLCJ0cmVsbGlzUXVhbnRpc2F0aW9uIjp0cnVlLCJvdmVyc2hvb3REZXJpbmdpbmciOnRydWUsIm9wdGltaXplU2NhbnMiOnRydWV9LCJyZXNpemUiOnsid2lkdGgiOjM3NSwiaGVpZ2h0IjoyNTAsImZpdCI6ImNvdmVyIn19fQ==)

### 100 kVA Stage V Power

The 100 kVA Stage V Power is suitable for temporary power at locations where capacity, limited emissions, and a manageable setup come together. You deploy this machine at construction projects, events, and temporary installations where continuity and ease of use matter.

- Power  100 kVA
- Emissions standard  Stage V
- Connection(s) (output)  1x set Powerlock, terminal clamps](https://www.bredenoord.com/en/rental/generators/stage-v-100-kva-genset/ "100 kVA Stage V Power")

![Bredenoord technical vacancies](https://d214mxx6i7ojph.cloudfront.net/eyJidWNrZXQiOiJicmVkZW5vb3JkLXByb2QtYnVja2V0Iiwia2V5IjoiaW1hZ2VzL2NvbnRlbnQvQnJlZGVub29yZF90ZWNobmljYWxfam9icy5qcGciLCJlZGl0cyI6eyJqcGVnIjp7InF1YWxpdHkiOjgyLCJwcm9ncmVzc2l2ZSI6dHJ1ZSwidHJlbGxpc1F1YW50aXNhdGlvbiI6dHJ1ZSwib3ZlcnNob290RGVyaW5naW5nIjp0cnVlLCJvcHRpbWl6ZVNjYW5zIjp0cnVlfSwicmVzaXplIjp7IndpZHRoIjo0MDAsImhlaWdodCI6MzAwLCJmaXQiOiJjb3ZlciJ9fX0=)

Working at Bredenoord### Do you have a passion for technology?

Our technology can be found at (international) sporting events such as Formula 1 races and UEFA matches, at music festivals and trade fairs, and on large construction sites. Generators, batteries, transformers, load banks, distribution boxes… Mobile energy solutions are close to our hearts, and as a technician at Bredenoord, you ensure that they function with 100% reliability, both in the workshop and during on-site deployments. Drawing on your background in electrical engineering or mechanics, you will continue to develop your skills at Bredenoord. You will work with a wide range of technologies and installations, in an environment where craftsmanship and innovation come together.

[ View job openings ](https://www.bredenoord.com/en/working-at-bredenoord/)

![Edwin de Graaf Bredenoord](https://d214mxx6i7ojph.cloudfront.net/eyJidWNrZXQiOiJicmVkZW5vb3JkLXByb2QtYnVja2V0Iiwia2V5IjoiaW1hZ2VzL2F2YXRhci9FZHdpbi1kZS1HcmFhZi1CcmVkZW5vb3JkLnBuZyIsImVkaXRzIjp7InBuZyI6eyJxdWFsaXR5Ijo4MiwicHJvZ3Jlc3NpdmUiOnRydWV9LCJyZXNpemUiOnsid2lkdGgiOjQwMCwiaGVpZ2h0IjozNzksImZpdCI6ImNvdmVyIn19fQ==)

Want to know more about Innovation at Bredenoord?

I'm happy to tell you more.

 Contact 

![Edwin de Graaf Bredenoord](https://d214mxx6i7ojph.cloudfront.net/eyJidWNrZXQiOiJicmVkZW5vb3JkLXByb2QtYnVja2V0Iiwia2V5IjoiaW1hZ2VzL2F2YXRhci9FZHdpbi1kZS1HcmFhZi1CcmVkZW5vb3JkLnBuZyIsImVkaXRzIjp7InBuZyI6eyJxdWFsaXR5Ijo4MiwicHJvZ3Jlc3NpdmUiOnRydWV9LCJyZXNpemUiOnsid2lkdGgiOjQwMCwiaGVpZ2h0IjozNzksImZpdCI6ImNvdmVyIn19fQ==)

**Edwin de Graaf**Product Manager Operational Equipment

## Explore other pillars of innovation

[![Header Alternative Fuels Renewables](https://d214mxx6i7ojph.cloudfront.net/eyJidWNrZXQiOiJicmVkZW5vb3JkLXByb2QtYnVja2V0Iiwia2V5IjoiaW1hZ2VzL2hlcm8vb2xkX3NpdGUvSGVhZGVyLUFsdGVybmF0aXZlLUZ1ZWxzLVJlbmV3YWJsZXNfMjAyNi0wMS0yOC0xMzAzMzVfcnRycS5qcGciLCJlZGl0cyI6eyJqcGVnIjp7InF1YWxpdHkiOjgyLCJwcm9ncmVzc2l2ZSI6dHJ1ZSwidHJlbGxpc1F1YW50aXNhdGlvbiI6dHJ1ZSwib3ZlcnNob290RGVyaW5naW5nIjp0cnVlLCJvcHRpbWl6ZVNjYW5zIjp0cnVlfSwicmVzaXplIjp7IndpZHRoIjozNzUsImhlaWdodCI6Mzc1LCJmaXQiOiJjb3ZlciJ9fX0=)

Alternative fuels &amp; renewables

At Bredenoord, we are steering a course towards an emissions-free future, with no emissions on construction sites, in infrastructure or at events. This requires more than just solar, wind or energy storage. We look beyond current standard solutions, because reliable, local energy generation without fossil fuels requires innovative technologies and vision.](https://www.bredenoord.com/en/innovations/alternative-fuels-renewables/ "Alternative fuels &amp; renewables")[![Bredenoord Data Io T](https://d214mxx6i7ojph.cloudfront.net/eyJidWNrZXQiOiJicmVkZW5vb3JkLXByb2QtYnVja2V0Iiwia2V5IjoiaW1hZ2VzL2hlcm8vQnJlZGVub29yZC1EYXRhLUlvVC5qcGciLCJlZGl0cyI6eyJqcGVnIjp7InF1YWxpdHkiOjgyLCJwcm9ncmVzc2l2ZSI6dHJ1ZSwidHJlbGxpc1F1YW50aXNhdGlvbiI6dHJ1ZSwib3ZlcnNob290RGVyaW5naW5nIjp0cnVlLCJvcHRpbWl6ZVNjYW5zIjp0cnVlfSwicmVzaXplIjp7IndpZHRoIjozNzUsImhlaWdodCI6Mzc1LCJmaXQiOiJjb3ZlciIsInBvc2l0aW9uIjoibGVmdCJ9fX0=)

Monitoring &amp; Control

Data and the Internet of Things (IoT) play a crucial role in making our energy supply more sustainable. Thanks to smart meters, sensors and algorithms, we can monitor and control energy consumption, production and storage in real time. This leads to optimisation, cost savings and a more efficient, sustainable energy system.](https://www.bredenoord.com/en/innovations/monitoring-and-control/ "Monitoring &amp; Control")[![Bredenord Innovatie Energy Storage](https://d214mxx6i7ojph.cloudfront.net/eyJidWNrZXQiOiJicmVkZW5vb3JkLXByb2QtYnVja2V0Iiwia2V5IjoiaW1hZ2VzL2hlcm8vQnJlZGVub3JkLUlubm92YXRpZS1FbmVyZ3ktU3RvcmFnZS5qcGciLCJlZGl0cyI6eyJqcGVnIjp7InF1YWxpdHkiOjgyLCJwcm9ncmVzc2l2ZSI6dHJ1ZSwidHJlbGxpc1F1YW50aXNhdGlvbiI6dHJ1ZSwib3ZlcnNob290RGVyaW5naW5nIjp0cnVlLCJvcHRpbWl6ZVNjYW5zIjp0cnVlfSwicmVzaXplIjp7IndpZHRoIjozNzUsImhlaWdodCI6Mzc1LCJmaXQiOiJjb3ZlciJ9fX0=)

Energy storage

Many of our customers are in the midst of a major transition. They are rapidly electrifying their processes, facing nitrogen-related challenges or experiencing grid congestion. Within our Energy Storage innovation pillar, Bredenoord therefore sees the deployment of energy storage systems, such as batteries, as a crucial step in the energy transition. These systems make it possible to temporarily store generated energy and make it available at the right moment, which is essential in an energy system that is becoming increasingly dynamic and less predictable.](https://www.bredenoord.com/en/innovations/energy-storage/ "Energy storage")

![Edwin de Graaf Bredenoord](https://d214mxx6i7ojph.cloudfront.net/eyJidWNrZXQiOiJicmVkZW5vb3JkLXByb2QtYnVja2V0Iiwia2V5IjoiaW1hZ2VzL2F2YXRhci9FZHdpbi1kZS1HcmFhZi1CcmVkZW5vb3JkLnBuZyIsImVkaXRzIjp7InBuZyI6eyJxdWFsaXR5Ijo4MiwicHJvZ3Jlc3NpdmUiOnRydWV9LCJyZXNpemUiOnsid2lkdGgiOjQwMCwiaGVpZ2h0IjozNzksImZpdCI6ImNvdmVyIn19fQ==)

**Edwin de Graaf**Product Manager Operational Equipment

![Edwin de Graaf Bredenoord](https://d214mxx6i7ojph.cloudfront.net/eyJidWNrZXQiOiJicmVkZW5vb3JkLXByb2QtYnVja2V0Iiwia2V5IjoiaW1hZ2VzL2F2YXRhci9FZHdpbi1kZS1HcmFhZi1CcmVkZW5vb3JkLnBuZyIsImVkaXRzIjp7InBuZyI6eyJxdWFsaXR5Ijo4MiwicHJvZ3Jlc3NpdmUiOnRydWV9LCJyZXNpemUiOnsid2lkdGgiOjQwMCwiaGVpZ2h0IjozNzksImZpdCI6ImNvdmVyIn19fQ==)

**Edwin de Graaf**Product Manager Operational Equipment